How long a garage or extension re-roof takes

A porch or bay-window rubber roof normally completes in half to 1 day, a single garage takes 1 to 2 days, and a full stripped warm-roof rear kitchen extension runs 2 to 3 days in dry weather.

Realistic on-site days for stripping, re-decking, warm-roof insulation and waterproofing, plus how Irish rain affects scheduling.

Free, no obligation. One local roofer prices it, not five.

  • half to 1 dayporch or bay-window fit
  • 1 to 2 days15–18 m² single garage
  • 2 to 3 dayswarm-roof kitchen extension
  • Dry deckessential for glue & liquid cure
Roofer checking and fixing black metal drip-edge trim along the fascia edge of a domestic roof

Typical day-by-day schedule on domestic jobs

Flat roofing moves fast once materials and skip bags are staged on site. Most delays come from waiting for a clean dry weather window rather than slow fitting time.

Porch or bay roof (3–8 m²)

Day 1 work
Strip felt, swap soft timber, bond rubber, fix trims & lead flashing
Day 2 / Day 3 work
Usually finished Day 1
Weather sensitivity
Needs 4 to 6 dry hours

Single garage (15–18 m²)

Day 1 work
Strip old felt into skip, replace rotted OSB3 & fix firring strips
Day 2 / Day 3 work
Glue single rubber sheet, kerb trims, drip plates & wall flashing
Weather sensitivity
Dry deck required on Day 2

Kitchen extension warm roof (25–35 m²)

Day 1 work
Strip felt, inspect joists, fit new OSB3 & seal vapour barrier watertight
Day 2 / Day 3 work
Lay PIR insulation, bond rubber, dress skylights, trims & lead chase
Weather sensitivity
Sealed watertight each evening

Liquid rubber overlay (15–30 m²)

Day 1 work
Power-wash moss, repair blisters, prime dry surface & base coat with fleece
Day 2 / Day 3 work
Roll final elastomeric topcoat once base coat cures
Weather sensitivity
Dry forecast between coats

Price my rubber roof

Four taps show our Irish price guide before we ask for a phone number. One local roofer rings you, not five.

A garage rubber roof, 12 to 20 m², replacing old felt: €2,200 to €3,900, supplied and fitted.

Step 1 of 5

Which flat roof are you pricing?

Pick the closest match. One local roofer checks the deck in person.

How this roof guide is worked out

The range reflects typical Irish supply-and-fit rubber roofing rates (13.5% residential VAT) for that structure, footprint and existing surface. Bare timber figures cover rubber membrane or liquid coating, adhesives, perimeter drip trims and labour on a sound OSB3 or plywood deck. Choosing old leaking felt adds an allowance for stripping, disposal and localised deck prep. Full rotten board replacement (€30 to €60/m²), Part L warm-roof PIR insulation (€40 to €80/m²) and upper-floor scaffolding are confirmed after a local roofer inspects the roof.

How roofers keep your house dry during unpredictable weather

Homeowners naturally worry about stripping an extension roof over a fitted kitchen in Ireland. Good flat roofers never strip more area than they can deck and seal with a self-adhesive vapour control layer before evening. That vapour barrier acts as an immediate temporary waterproof roof overnight, letting insulation and rubber membrane proceed cleanly the next dry morning.

  • Ask for a dry-window start rather than a rigid rainy date. Pressuring a roofer to glue rubber onto wet timber causes adhesion failure later.
  • Clear cars from the drive on strip-out morning. Keeping van and skip access straight beside the garage shaves hours off carrying old bitumen and OSB3 sheets.
  • Confirm scaffolding lead time for dormers. Tower setup usually goes up the afternoon before roofing starts and clears the day after sign-off.

Questions homeowners ask

How soon after booking can an Irish flat roofer start?

Outside major winter storm surges, most local flat roofers schedule single garages and extensions within 1 to 3 weeks, slotting work into the next dry forecast spell.

Can rubber roofing be fitted in cold winter temperatures?

Cold dry days above 5°C are fine for solvent contact adhesives and moisture-cured polyurethane liquid systems. Water-based deck adhesives slow down sharply below 5°C, so winter jobs often switch to all-weather contact adhesive or cold-cure liquid systems.

Do I need to be home while the flat roof is replaced?

Only at the start for side-gate access and outdoor power if needed, and at completion to inspect neat trims, clear gutters and review your written warranty.

How long after fitting a liquid rubber roof is it rainproof?

Modern moisture-cured polyurethane coatings typically become shower-resistant within 1 to 2 hours of rolling, though full cure for foot traffic takes a full day.

All rubber roofing pages and guides

Roofer checking and fixing black metal drip-edge trim along the fascia edge of a domestic roof

Book your dry-weather slot with one local roofer

Check your m² estimate first, then arrange a quick ladder check and start window with a single flat roofer in your county.